Energy pioneer, entrepreneur, and long-serving Alabama Power president Thomas W. Martin (1881-1964) at the Lock 18 site on the Coosa River, where construction of the Jordan Dam was completed in 1928.
Thomas W. Martin at Lock 18 Site
![](https://bunny-wp-pullzone-5vqgtgkbhi.b-cdn.net/wp-content/uploads/2023/04/Tom-Martin-Lock-18.jpg)
Courtesy of the Alabama Power Company
Appears In
![](https://bunny-wp-pullzone-5vqgtgkbhi.b-cdn.net/wp-content/uploads/2023/04/Tom-Martin-Lock-18.jpg)