Toyota Production Line

Employees Landon Bryan, left, and Kim Moore stand next to an engine on the 5.7 L V8 assembly line at the Toyota Motor Manufacturing Alabama (TMMAL) in Huntsville, Madison County. The plant produced its first engine in 2003.

Team members on the 5.7L V8 assembly line at the Toyota plant in Alabama, 2008
Photo by Glenn Baeske, The Huntsville Times. All rights reserved. Used with permission.
Team members on the 5.7L V8 assembly line at the Toyota plant in Alabama, 2008