In 1963, Alabama Power Company installed hydroelectric power equipment at the Bankhead Lock and Dam, the highest dam on the Black Warrior River. The power plant is located to the left of the dam, and a portion of the original two-chamber lock juts from the dam's right side.
Bankhead Lock and Dam

Courtesy of Alabama Power Company
Appears In
